FEASIBILITY STUDY OF ECONOMIC, ENGINEERING AND ENVIRONMENT IMPACT THE ROUTE DEVELOPMENT CONNECTING THAILAND - MALAYSIA BETWEEN SATUN – PERLIS
FEASIBILITY STUDY OF ECONOMIC, ENGINEERING AND ENVIRONMENT IMPACT THE ROUTE DEVELOPMENT CONNECTING THAILAND - MALAYSIA BETWEEN SATUN – PERLIS
Survey and Design 4-lane on Highway No.116, Pa Sak - Tha Wang Phrao Subdistrict Project
Survey and Design 4-lane on Highway No.106, Thoen District - Li District Project
Survey and Design 4-lane on Highway No.1020, Chiang Rai - Chiang Khong District section, Ban Pong Kluea - Ban Plong Subdistrict Project
Survey and Design 4-lane of New Highway Connecting Highway No.2 to Highway No.222 ,Udon Thani - Bueng Kan Project
The Model Study of the communication network development in the central and southern provinces connected to the Economic Corridor area under the GMS framework. For support economic and tourism development of Bangkok (2nd time)
Construction Design, Environmental Impacts Study Expanding runways, Taxiways, and Aprons with airport electric system and other components Betong Airport, Yarom Subdistrict, Betong District, Yala Province 1 Location
1199 Piyawan Tower 8th Fl.,Phaholyothin Rd., Phayathai, Phayathai, Bangkok 10400
Tel : (+66) 2 619-9931
Fax: (+66) 2 619-9932
E-mail : dc@decade.co.th